Timeline: what a bathroom remodel usually involves

1 min read RemodelSD San Diego, CA

Timeline: what a bathroom remodel usually involves

By RemodelSD | January 09, 2026 | San Diego

Bathroom remodels follow a sequence similar to kitchens, but with extra waterproofing and tile steps.

Typical phases:

1) design + selections

2) ordering (tile, vanity, fixtures)

3) demo

4) rough plumbing/electrical

5) inspections (as required)

6) waterproofing + shower build

7) tile install + curing time

8) vanity + counters

9) fixtures + glass

10) punch list + final walkthrough

What slows bathroom projects down:

  • specialty tile on backorder
  • custom shower glass lead times
  • changing fixture selections mid-project